Right Way Capital Case Studies: Real Estate That Creates Value

GVA 48-Unit Multifamily – $5.28M

Efficient urban multifamily construction delivered early with full occupancy and strong investor satisfaction.

Scope

Developed a 48-unit apartment building with a mix of 1- and 2-bedroom units, modern interiors, and resident amenities including a fitness center, bike storage, and green space.

Challenges

Built on a tight urban site with limited staging space and compressed schedule due to lender deadlines and pre-leasing commitments.

Actions

Sequenced interior and exterior trades for space efficiency, tracked progress using digital platforms, and coordinated weekly with subcontractors and suppliers.

Results

Delivered three weeks early, reached full occupancy at launch, and received positive feedback from investors and residents, reinforcing viability of urban infill projects.

120 Single Family Homes – $30M

Master-planned community delivered under budget with rapid sales and satisfied homeowners.

Scope

Large-scale development of 120 single-family homes with internal roadways, full utilities, playgrounds, and a community clubhouse.

Challenges

Required comprehensive workforce and schedule coordination across multiple phases while mitigating weather delays and material supply risks.

Actions

Adopted phased construction strategy, negotiated bulk supply contracts, and implemented real-time project management for flexibility.

Results

Delivered homes below per-unit projections, sold out rapidly in each release phase, and achieved strong homeowner and investor satisfaction.

Jefferson Townhomes – $8.6M

Sustainable urban townhomes delivered on time with pre-leased units and energy performance improvements.

Scope

Developed 36 luxury townhomes in an urban infill site with integrated garages, rooftop terraces, and LEED Silver green energy features.

Challenges

Municipal zoning limitations, dense site constraints, and integrating sustainable systems with high-end finishes.

Actions

Engaged city planners and neighborhood stakeholders early, used BIM for systems coordination and clash detection, and consulted green building specialists during design.

Results

Completed on time with 14% energy performance improvement over benchmarks; all units pre-leased prior to completion.

Apple Creek Apartments – $2.1M

Multifamily building completed ahead of schedule with full occupancy and seamless move-in experience.

Scope

Built a 16-unit multifamily building with modern finishes, efficient layouts, and amenities on a previously undeveloped site.

Challenges

Delays with utility access threatened the construction timeline.

Actions

Conducted utility coordination sessions prior to groundbreaking and fast-tracked vertical framing while resolving site issues in parallel.

Results

Completed ahead of regional timelines, reached full occupancy within seven months, and delivered a seamless move-in experience with no major issues.

1,150+ Unit Turns – 14 Properties – 18 Months

Portfolio-wide multifamily make-readies delivered efficiently, boosting occupancy across all properties.

Scope

Managed over 1,150 unit make-readies across 14 properties, including full interior prep, repair, cleaning, and compliance checks.

Challenges

Coordinating work across dispersed geographies while managing supply chain and labor challenges.

Actions

Centralized oversight, bulk-purchased materials, used cloud-based tracking, and coordinated with residents and site teams.

Results

All units delivered within 18 months, 98% passed first inspections, occupancy increased 10–15% portfolio-wide.

Texas Roadhouse – $4.6M

Franchise ground-up restaurant delivered on schedule and budget with corporate praise.

Scope

Ground-up construction including dining, kitchen, patio, parking, and landscaping.

Challenges

Strict franchise specifications, complex kitchen systems, fixed grand opening date, and undeveloped site.

Actions

Coordinated early with corporate, detailed design reviews, phased equipment procurement, and sequenced parallel construction work.

Results

Completed on schedule and budget, passed all inspections, received strong corporate and community praise.

Domino’s Location 1 – $2.25M

Ground-up franchise restaurant delivered two weeks ahead of schedule.

Scope

Constructed per franchise prototype with high-efficiency kitchen, walk-in refrigeration, and order tracking systems.

Challenges

Tight schedule, long lead times for custom equipment, compact site logistics.

Actions

Prioritized early procurement, adjusted sequencing, and used real-time planning tools.

Results

Opened ahead of schedule, passed inspections, and provided franchisee competitive head start.

Domino’s Location 2- $1.6M

Seamless construction of a franchise restaurant with on-time launch and smooth operations.

Scope

Built franchise location including site work, building shell, kitchen, and energy-efficient upgrades.

Challenges

Permitting delays due to code revisions.

Actions

Engaged city officials early, revised plans proactively, coordinated closely with subcontractors.

Results

Opened on time, passed inspections promptly, and launched smoothly.

Francesca’s Retail Buildout – Historic Preservation

High-end retail store delivered with historic preservation in an urban mall.

Scope

Demolition and luxury buildout including millwork, lighting, and HVAC upgrades.

Challenges

Tight material access, complex code requirements.

Actions

Phased demolition, engaged code consultant, coordinated with mall management.

Results

Completed in 30 days, passed all inspections, modernized space while preserving historic integrity.

Metro PCS Interior Demo – 72 Hours

Rapid interior buildout completed within 72 hours with zero downtime.

Scope

Full interior gut and rebuild of retail store including fixtures, POS, cabling, and security systems.

Challenges

Aggressive turnaround, overlapping trades, confined space.

Actions

Around-the-clock scheduling, staged materials on-site, coordinated inspections.

Results

Delivered within 72 hours, passed inspections, reopened without downtime.

Wendy’s Restaurant Remodel – 32 Days

Operational restaurant remodeled with zero service interruptions.

Scope

Interior and exterior remodel including lobby, drive-thru, façade, restrooms, and dining area upgrades.

Challenges

Complete transformation while keeping drive-thru open and maintaining service.

Actions

Phased work during off-peak hours, deployed protective barriers, fast-tracked permitting and materials.

Results

Completed in 32 days, modernized customer experience, improved operational flow.

Solid Rock Tiny Tots Remodel / TI – Prefabricated Systems

Daycare remodel completed without disrupting operations, improving learning environment and parent satisfaction.

Scope

Renovated 5,600 SF facility with new roof, classrooms, and safety systems.

Challenges

Child safety, licensing and accessibility codes, operational continuity.

Actions

Phased construction during off-hours, temporary relocation of classrooms, prefabricated systems to reduce risk.

Results

Completed without interruption, passed inspections, enhanced learning environment.

Home Depot Retrofit / TI / Reset – $1.82M

Major retail retrofit executed while store remained fully operational.

Scope

Full interior reconfiguration, MEP upgrades, and exterior façade enhancements across 120,000 SF.

Challenges

High-volume traffic, night work, strict safety compliance.

Actions

Phased construction by department, high-impact overnight work, aligned with branding and vendors.

Results

Store stayed operational, achieved all safety and brand benchmarks, delivered improved layout and customer experience.