GVA 48-Unit Multifamily – $5.28M
Efficient urban multifamily construction delivered early with full occupancy and strong investor satisfaction.

Scope
Developed a 48-unit apartment building with a mix of 1- and 2-bedroom units, modern interiors, and resident amenities including a fitness center, bike storage, and green space.
Challenges
Built on a tight urban site with limited staging space and compressed schedule due to lender deadlines and pre-leasing commitments.
Actions
Sequenced interior and exterior trades for space efficiency, tracked progress using digital platforms, and coordinated weekly with subcontractors and suppliers.
Results
Delivered three weeks early, reached full occupancy at launch, and received positive feedback from investors and residents, reinforcing viability of urban infill projects.
120 Single Family Homes – $30M
Master-planned community delivered under budget with rapid sales and satisfied homeowners.

Scope
Large-scale development of 120 single-family homes with internal roadways, full utilities, playgrounds, and a community clubhouse.
Challenges
Required comprehensive workforce and schedule coordination across multiple phases while mitigating weather delays and material supply risks.
Actions
Adopted phased construction strategy, negotiated bulk supply contracts, and implemented real-time project management for flexibility.
Results
Delivered homes below per-unit projections, sold out rapidly in each release phase, and achieved strong homeowner and investor satisfaction.
Jefferson Townhomes – $8.6M
Sustainable urban townhomes delivered on time with pre-leased units and energy performance improvements.

Scope
Developed 36 luxury townhomes in an urban infill site with integrated garages, rooftop terraces, and LEED Silver green energy features.
Challenges
Municipal zoning limitations, dense site constraints, and integrating sustainable systems with high-end finishes.
Actions
Engaged city planners and neighborhood stakeholders early, used BIM for systems coordination and clash detection, and consulted green building specialists during design.
Results
Completed on time with 14% energy performance improvement over benchmarks; all units pre-leased prior to completion.
Apple Creek Apartments – $2.1M
Multifamily building completed ahead of schedule with full occupancy and seamless move-in experience.

Scope
Built a 16-unit multifamily building with modern finishes, efficient layouts, and amenities on a previously undeveloped site.
Challenges
Delays with utility access threatened the construction timeline.
Actions
Conducted utility coordination sessions prior to groundbreaking and fast-tracked vertical framing while resolving site issues in parallel.
Results
Completed ahead of regional timelines, reached full occupancy within seven months, and delivered a seamless move-in experience with no major issues.
1,150+ Unit Turns – 14 Properties – 18 Months
Portfolio-wide multifamily make-readies delivered efficiently, boosting occupancy across all properties.

Scope
Managed over 1,150 unit make-readies across 14 properties, including full interior prep, repair, cleaning, and compliance checks.
Challenges
Coordinating work across dispersed geographies while managing supply chain and labor challenges.
Actions
Centralized oversight, bulk-purchased materials, used cloud-based tracking, and coordinated with residents and site teams.
Results
All units delivered within 18 months, 98% passed first inspections, occupancy increased 10–15% portfolio-wide.
Texas Roadhouse – $4.6M
Franchise ground-up restaurant delivered on schedule and budget with corporate praise.

Scope
Ground-up construction including dining, kitchen, patio, parking, and landscaping.
Challenges
Strict franchise specifications, complex kitchen systems, fixed grand opening date, and undeveloped site.
Actions
Coordinated early with corporate, detailed design reviews, phased equipment procurement, and sequenced parallel construction work.
Results
Completed on schedule and budget, passed all inspections, received strong corporate and community praise.
Domino’s Location 1 – $2.25M
Ground-up franchise restaurant delivered two weeks ahead of schedule.

Scope
Constructed per franchise prototype with high-efficiency kitchen, walk-in refrigeration, and order tracking systems.
Challenges
Tight schedule, long lead times for custom equipment, compact site logistics.
Actions
Prioritized early procurement, adjusted sequencing, and used real-time planning tools.
Results
Opened ahead of schedule, passed inspections, and provided franchisee competitive head start.
Domino’s Location 2- $1.6M
Seamless construction of a franchise restaurant with on-time launch and smooth operations.

Scope
Built franchise location including site work, building shell, kitchen, and energy-efficient upgrades.
Challenges
Permitting delays due to code revisions.
Actions
Engaged city officials early, revised plans proactively, coordinated closely with subcontractors.
Results
Opened on time, passed inspections promptly, and launched smoothly.
Francesca’s Retail Buildout – Historic Preservation
High-end retail store delivered with historic preservation in an urban mall.

Scope
Demolition and luxury buildout including millwork, lighting, and HVAC upgrades.
Challenges
Tight material access, complex code requirements.
Actions
Phased demolition, engaged code consultant, coordinated with mall management.
Results
Completed in 30 days, passed all inspections, modernized space while preserving historic integrity.
Metro PCS Interior Demo – 72 Hours
Rapid interior buildout completed within 72 hours with zero downtime.

Scope
Full interior gut and rebuild of retail store including fixtures, POS, cabling, and security systems.
Challenges
Aggressive turnaround, overlapping trades, confined space.
Actions
Around-the-clock scheduling, staged materials on-site, coordinated inspections.
Results
Delivered within 72 hours, passed inspections, reopened without downtime.
Wendy’s Restaurant Remodel – 32 Days
Operational restaurant remodeled with zero service interruptions.

Scope
Interior and exterior remodel including lobby, drive-thru, façade, restrooms, and dining area upgrades.
Challenges
Complete transformation while keeping drive-thru open and maintaining service.
Actions
Phased work during off-peak hours, deployed protective barriers, fast-tracked permitting and materials.
Results
Completed in 32 days, modernized customer experience, improved operational flow.
Solid Rock Tiny Tots Remodel / TI – Prefabricated Systems
Daycare remodel completed without disrupting operations, improving learning environment and parent satisfaction.

Scope
Renovated 5,600 SF facility with new roof, classrooms, and safety systems.
Challenges
Child safety, licensing and accessibility codes, operational continuity.
Actions
Phased construction during off-hours, temporary relocation of classrooms, prefabricated systems to reduce risk.
Results
Completed without interruption, passed inspections, enhanced learning environment.
Home Depot Retrofit / TI / Reset – $1.82M
Major retail retrofit executed while store remained fully operational.

Scope
Full interior reconfiguration, MEP upgrades, and exterior façade enhancements across 120,000 SF.
Challenges
High-volume traffic, night work, strict safety compliance.
Actions
Phased construction by department, high-impact overnight work, aligned with branding and vendors.
Results
Store stayed operational, achieved all safety and brand benchmarks, delivered improved layout and customer experience.